This was a complex Civil Engineering Project carried out for our client which consisted of the following: Excavation of over 3,500 cu.m of unsuitable ground. Temporary Works Installations (Sheet Piling/Coffer-dam). Installation of Deep Storm & Sewer Drainage to a depth >7m below ground level. Installation of subsequent Manholes. Timber Post & Rail Fencing. CCTV Surveying