This was a project that consisted of the following works in one of the largest Universities in the Country. The project involved the excavation/removal of existing paving, installation of new drainage and pathways, installation of large Limestone Kerb sets aswell as high spec Granite Paving for our client. Pedestrian Management was another major factor on
Civils Groundworks
admin2021-09-07T08:41:32+00:00This is a largescale housing development project consisting of over 130 separate units ranging from apartments to houses. Conradh carried out the civil engineering elements of the work, which consisted mainly of the following: Earthworks & Muck Shifting Operations. Structure Footings: Excavate, Install Stone & Steelworks, Pour & Finish Concrete. Pipework: All Storm & Foul
In-situ Concrete Works
admin2021-09-08T13:16:29+00:00This was a project that consisted of the following: Excavation of approx 700m2 of existing ground in order to construct 2Nr in-situ concrete walls, designed in order to retain the adjoining embankments. 3m High wall – 130m long. 5m to 2.5m stepped wall – 65m long. 42t of steel reinforcement tied and fixed into position.
Deep Storm & Sewer Drainage
admin2021-09-17T08:40:09+00:00This was a complex Civil Engineering Project carried out for our client which consisted of the following: Excavation of over 3,500 cu.m of unsuitable ground. Temporary Works Installations (Sheet Piling/Coffer-dam). Installation of Deep Storm & Sewer Drainage to a depth >7m below ground level. Installation of subsequent Manholes. Timber Post & Rail Fencing. CCTV Surveying