This was a project that consisted of the following: Excavation of approx 700m2 of existing ground in order to construct 2Nr in-situ concrete walls, designed in order to retain the adjoining embankments. 3m High wall – 130m long. 5m to 2.5m stepped wall – 65m long. 42t of steel reinforcement tied and fixed into position.
