Project Description
This was a project that consisted of the following:
- Excavation of approx 700m2 of existing ground in order to construct 2Nr in-situ concrete walls, designed in order to retain the adjoining embankments.
- 3m High wall – 130m long.
- 5m to 2.5m stepped wall – 65m long.
- 42t of steel reinforcement tied and fixed into position.
- 1,250m2 of Shuttering Formwork supplied and erected by Conradh throughout this project.
- m of concrete, 1 installed to a fair faced finish & 1 installed to a standard finish.
- Concrete Pumping.