Project Description

This was a project that consisted of the following:

  • Excavation of approx 700m2 of existing ground in order to construct 2Nr in-situ concrete walls, designed in order to retain the adjoining embankments.
  • 3m High wall – 130m long.
  • 5m to 2.5m stepped wall – 65m long.
  • 42t of steel reinforcement tied and fixed into position.
  • 1,250m2 of Shuttering Formwork supplied and erected by Conradh throughout this project.
  • m of concrete, 1 installed to a fair faced finish & 1 installed to a standard finish.
  • Concrete Pumping.