This was a project that consisted of the following works through heavily trafficked streets through Cork City: Excavation of large sections of Roadway through the busy streets of Cork City while maintaining a reasonably steady flow of traffic throughout the works under our Traffic Management Set-up’s. We repaired and replaced old sections of main &
Civils Groundworks
admin2021-09-07T08:41:32+00:00This is a largescale housing development project consisting of over 130 separate units ranging from apartments to houses. Conradh carried out the civil engineering elements of the work, which consisted mainly of the following: Earthworks & Muck Shifting Operations. Structure Footings: Excavate, Install Stone & Steelworks, Pour & Finish Concrete. Pipework: All Storm & Foul
In-situ Concrete Works
admin2021-09-08T13:16:29+00:00This was a project that consisted of the following: Excavation of approx 700m2 of existing ground in order to construct 2Nr in-situ concrete walls, designed in order to retain the adjoining embankments. 3m High wall – 130m long. 5m to 2.5m stepped wall – 65m long. 42t of steel reinforcement tied and fixed into position.